
Healthcare
VGH Tower
New Construction and ongoing fit-up of 17 floor hospital tower.
Complete DDC system integrated into the Triatec system for room pressurization.
General Contractor: Vanbots
Mechanical Contractors: Lockerbie and Hole
Mechanical Consultants: Keen Engineering
VGH Centennial Pavilion
DDC retrofit to existing hospital building.
General Contractor: Vanbots
Mechanical Contractors: Keith Plumbing and Heating
Mechanical Consultants: Stantec
BC Cancer Research Facility
New Construction of cancer research facility including integration to fume hoods
General Contractor: Ledcor Construction
Mechanical Contractors: Lockerbie and Hole
Mechanical Consultants: Keen
|